Click on the button below to explore the infographic about
" Analysis of Existing Transit Oriented Development (TOD) "
The Governor of Japan Bank for International Cooperation (JBIC) Kyosuke Shinozawa and the Indonesian Ambassador to Japan H.E. Yusuf Anwar signed the loan agreement for the MRT Jakarta project.
PT MRT Jakarta was established as a limited liability company with the provincial government of DKI Jakarta as its majority shareholder (99.78%).
Commencement of basic design engineering at the Transportation Ministry.
Tender for the MRT project commences following a legal status issued by central government and DKI Jakarta provincial government, which declares that all activities would be under the authority of PT MRT Jakarta.
Ground Breaking for corridor Lebak Bulus - Bundaran HI
In 2013, DKI Jakarta governor Joko Widodo reviews MRT Jakarta for its preparedness and project continuation, groundbreaking preparation and dissemination. The project of LRT Jakarta began to emerge when the MRT Jakarta Project was reactivated in October.
Relocation of Lebak Bulus terminal and preparation for the construction. The project acknowledged by World Finance as one of the World’s 20 Best Projects. 22 June 2016, LRT Jakarta construction of Route 1 started.
The project finished. Phase 1 of the MRT project was officially opened on 24 March 2019. Meanwhile, LRT line opened for free public trial run on July 2019 and ommercial operations began on 1 December 2019.
A simplified drawing that represents only essential features.
Routes are commonly drawn straight. With fixed and stylized angles, such as 45º and 90º, or 30º, 60º and 90º.
Widely used in city transport systems.
The map will not show all the roads and buildings. In this case, the entire subway system can be represented as differently colored lines depicting the different subway routes, with dots indicating the stops along the lines.
In this project, i also added some 'tourist spots' nearby so users can easily know where to go.
Download Map Every MRT Jakarta passengers must have a ticket for the full journey (see the fare below).
Meanwhile, LRT Jakarta fare is a fixed rate at Rp5,000 for a one-way trip without the limit distance.
Passengers can purchase a ticket at the ticket booth or at Ticket Vending Machine (TVM) for Single-trip or Multi-trip Ticket. Both MRT and LRT passengers could also pay by tapping e-money cards issued by its bank partners, such as Jak Lingko, JakCard (Bank DKI), Brizzi (Bank BRI), Tap Cash (Bank BNI), Flazz (Bank BCA), and eMoney (Bank Mandiri). Tap the card when you enter the gate or out from the gate.
Download Timetable500m of Service Area - Walk Within 10 Minutes
Integration
Cafe
Restaurant
Hotel
Mall
500m of Service Area - Walk Within 10 Minutes
Integration
Cafe
Restaurant
Hotel
Mall
Department of Geodetic Engineering
Faculty of Engineering, Universitas Gadjah Mada
Jl. Grafika No.2 Bulaksumur, Yogyakarta, 55281
alunsagaraputra@gmail.com
alun.sagara.putra@mail.ugm.ac.id
Please ask me through email