MRT & LRT Jakarta

Brand New Transportation System in Jakarta

Click on the button below to explore the infographic about
" Analysis of Existing Transit Oriented Development (TOD) "

Story Map of TOD

History

Since 1985, the plan to build an MRT system in Jakarta has experienced many vicissitudes. The project was not declared as a national project until then President Susilo Bambang Yudhoyono affirmed otherwise in 2005.

  • Nov 28th, 2006

    Sutiyoso Era

    The Governor of Japan Bank for International Cooperation (JBIC) Kyosuke Shinozawa and the Indonesian Ambassador to Japan H.E. Yusuf Anwar signed the loan agreement for the MRT Jakarta project.

  • June 17th, 2008

    Fauzi Bowo Era

    PT MRT Jakarta was established as a limited liability company with the provincial government of DKI Jakarta as its majority shareholder (99.78%).

  • 2010

    Commencement of basic design engineering at the Transportation Ministry.

    2011

    Tender for the MRT project commences following a legal status issued by central government and DKI Jakarta provincial government, which declares that all activities would be under the authority of PT MRT Jakarta.

    2012

    Ground Breaking for corridor Lebak Bulus - Bundaran HI

  • 2013

    Joko Widodo Era

    In 2013, DKI Jakarta governor Joko Widodo reviews MRT Jakarta for its preparedness and project continuation, groundbreaking preparation and dissemination. The project of ​​LRT Jakarta began to emerge when the MRT Jakarta Project was reactivated in October.

  • 2014

    BTP Era

    Relocation of Lebak Bulus terminal and preparation for the construction. The project acknowledged by World Finance as one of the World’s 20 Best Projects. 22 June 2016, LRT Jakarta construction of Route 1 started.

  • 2017 - Now

    Anies Baswedan Era

    The project finished. Phase 1 of the MRT project was officially opened on 24 March 2019. Meanwhile, LRT line opened for free public trial run on July 2019 and ommercial operations began on 1 December 2019.

The Map

Why Schematic Map?

A simplified drawing that represents only essential features.

Routes are commonly drawn straight. With fixed and stylized angles, such as 45º and 90º, or 30º, 60º and 90º.

Widely used in city transport systems.

The map will not show all the roads and buildings. In this case, the entire subway system can be represented as differently colored lines depicting the different subway routes, with dots indicating the stops along the lines.

In this project, i also added some 'tourist spots' nearby so users can easily know where to go.

Download Map

FARE & TIMETABLE

Every MRT Jakarta passengers must have a ticket for the full journey (see the fare below).
Meanwhile, LRT Jakarta fare is a fixed rate at Rp5,000 for a one-way trip without the limit distance.

Passengers can purchase a ticket at the ticket booth or at Ticket Vending Machine (TVM) for Single-trip or Multi-trip Ticket. Both MRT and LRT passengers could also pay by tapping e-money cards issued by its bank partners, such as Jak Lingko, JakCard (Bank DKI), Brizzi (Bank BRI), Tap Cash (Bank BNI), Flazz (Bank BCA), and eMoney (Bank Mandiri). Tap the card when you enter the gate or out from the gate.

Download Timetable

Origin Destination Duration Fare (IDR)
Lebak Bulus Fatmawati 3 Minutes 4,000
Lebak Bulus Cipete Raya 6 Minutes 5,000
Lebak Bulus Haji Nawi 9 Minutes 6,000
Lebak Bulus Blok A 10 Minutes 7,000
Lebak Bulus Blok M 13 Minutes 8,000
Lebak Bulus ASEAN 15 Minutes 9,000
Lebak Bulus Senayan 17 Minutes 10,000
Lebak Bulus Istora 19 Minutes 11,000
Lebak Bulus Bend. Hilir 22 Minutes 12,000
Lebak Bulus Setiabudi 24 Minutes 13,000
Lebak Bulus Dukuh Atas 26 Minutes 14,000
Lebak Bulus Bundaran HI 29 Minutes 14,000
Fatmawati Lebak Bulus 3 Minutes 4,000
Fatmawati Cipete 3 Minutes 5,000
Fatmawati Haji Nawi 5 Minutes 5,000
Fatmawati Blok A 7 Minutes 6,000
Fatmawati Blok M 10 Minutes 7,000
Fatmawati ASEAN 12 Minutes 8,000
Fatmawati Senayan 14 Minutes 9,000
Fatmawati Istora 16 Minutes 9,000
Fatmawati Bend. Hilir 19 Minutes 10,000
Fatmawati Setiabudi 21 Minutes 11,000
Fatmawati Dukuh Atas 23 Minutes 12,000
Fatmawati Bundaran HI 26 Minutes 13,000
Cipete Lebak Bulus 6 Minutes 5,000
Cipete Fatmawati 3 Minutes 4,000
Cipete Haji Nawi 2 Minutes 3,000
Cipete Blok A 4 Minutes 4,000
Cipete Blok M 7 Minutes 5,000
Cipete ASEAN 9 Minutes 6,000
Cipete Senayan 11 Minutes 7,000
Cipete Istora 13 Minutes 8,000
Cipete Bend. Hilir 16 Minutes 9,000
Cipete Setiabudi 18 Minutes 9,000
Cipete Dukuh Atas 20 Minutes 10,000
Cipete Bundaran HI 23 Minutes 11,000
Haji Nawi Lebak Bulus 8 Minutes 6,000
Haji Nawi Fatmawati 5 Minutes 5,000
Haji Nawi Cipete 2 Minutes 3,000
Haji Nawi Blok A 2 Minutes 3,000
Haji Nawi Blok M 5 Minutes 4,000
Haji Nawi ASEAN 7 Minutes 5,000
Haji Nawi Senayan 9 Minutes 6,000
Haji Nawi Istora 11 Minutes 7,000
Haji Nawi Bend. Hilir 14 Minutes 8,000
Haji Nawi Setiabudi 16 Minutes 8,000
Haji Nawi Dukuh Atas 18 Minutes 9,000
Haji Nawi Bundaran HI 21 Minutes 11,000
Blok A Lebak Bulus 11 Minutes 7,000
Blok A Fatmawati 8 Minutes 6,000
Blok A Cipete 5 Minutes 5,000
Blok A Haji Nawi 3 Minutes 3,000
Blok A Blok M 3 Minutes 3,000
Blok A ASEAN 5 Minutes 4,000
Blok A Senayan 7 Minutes 5,000
Blok A Istora 9 Minutes 6,000
Blok A Bend. Hilir 12 Minutes 7,000
Blok A Setiabudi 14 Minutes 7,000
Blok A Dukuh Atas 16 Minutes 8,000
Blok A Bundaran HI 19 Minutes 9,000
Blok M Lebak Bulus 13 Minutes 8,000
Blok M Fatmawati 10 Minutes 7,000
Blok M Cipete 7 Minutes 5,000
Blok M Haji Nawi 5 Minutes 4,000
Blok M Blok A 2 Minutes 3,000
Blok M ASEAN 2 Minutes 3,000
Blok M Senayan 4 Minutes 4,000
Blok M Istora 6 Minutes 5,000
Blok M Bend. Hilir 9 Minutes 6,000
Blok M Setiabudi 11 Minutes 6,000
Blok M Dukuh Atas 13 Minutes 7,000
Blok M Bundaran HI 16 Minutes 8,000
ASEAN Lebak Bulus 16 Minutes 9,000
ASEAN Fatmawati 13 Minutes 7,000
ASEAN Cipete 10 Minutes 6,000
ASEAN Haji Nawi 8 Minutes 5,000
ASEAN Blok A 5 Minutes 4,000
ASEAN Blok M 3 Minutes 3,000
ASEAN Senayan 2 Minutes 3,000
ASEAN Istora 4 Minutes 4,000
ASEAN Bend. Hilir 7 Minutes 5,000
ASEAN Setiabudi 9 Minutes 6,000
ASEAN Dukuh Atas 11 Minutes 7,000
ASEAN Bundaran HI 14 Minutes 7,000
Senayan Lebak Bulus 18 Minutes 10,000
Senayan Fatmawati 15 Minutes 9,000
Senayan Cipete 12 Minutes 7,000
Senayan Haji Nawi 10 Minutes 6,000
Senayan Blok A 7 Minutes 5,000
Senayan Blok M 5 Minutes 4,000
Senayan ASEAN 2 Minutes 3,000
Senayan Istora 2 Minutes 3,000
Senayan Bend. Hilir 5 Minutes 4,000
Senayan Setiabudi 7 Minutes 4,000
Senayan Dukuh Atas 9 Minutes 5,000
Senayan Bundaran HI 12 Minutes 6,000
Istora Lebak Bulus 20 Minutes 11,000
Istora Fatmawati 17 Minutes 9,000
Istora Cipete 14 Minutes 8,000
Istora Haji Nawi 12 Minutes 7,000
Istora Blok A 9 Minutes 6,000
Istora Blok M 7 Minutes 5,000
Istora ASEAN 4 Minutes 4,000
Istora Senayan 2 Minutes 3,000
Istora Bend. Hilir 3 Minutes 3,000
Istora Setiabudi 5 Minutes 3,000
Istora Dukuh Atas 7 Minutes 4,000
Istora Bundaran HI 10 Minutes 5,000
Bend. Hilir Lebak Bulus 22 Minutes 12,000
Bend. Hilir Fatmawati 19 Minutes 10,000
Bend. Hilir Cipete 16 Minutes 9,000
Bend. Hilir Haji Nawi 14 Minutes 8,000
Bend. Hilir Blok A 11 Minutes 7,000
Bend. Hilir Blok M 9 Minutes 6,000
Bend. Hilir ASEAN 6 Minutes 5,000
Bend. Hilir Senayan 4 Minutes 4,000
Bend. Hilir Istora 2 Minutes 3,000
Bend. Hilir Setiabudi 2 Minutes 3,000
Bend. Hilir Dukuh Atas 4 Minutes 3,000
Bend. Hilir Bundaran HI 7 Minutes 4,000
Setiabudi Lebak Bulus 25 Minutes 13,000
Setiabudi Fatmawati 22 Minutes 10,000
Setiabudi Cipete 19 Minutes 9,000
Setiabudi Haji Nawi 17 Minutes 8,000
Setiabudi Blok A 14 Minutes 7,000
Setiabudi Blok M 11 Minutes 6,000
Setiabudi ASEAN 8 Minutes 6,000
Setiabudi Senayan 6 Minutes 4,000
Setiabudi Istora 4 Minutes 3,000
Setiabudi Bend. Hilir 2 Minutes 3,000
Setiabudi Dukuh Atas 2 Minutes 3,000
Setiabudi Bundaran HI 5 Minutes 4,000
Dukuh Atas Lebak Bulus 26 Minutes 14,000
Dukuh Atas Fatmawati 23 Minutes 12,000
Dukuh Atas Cipete 20 Minutes 10,000
Dukuh Atas Haji Nawi 18 Minutes 9,000
Dukuh Atas Blok A 15 Minutes 8,000
Dukuh Atas Blok M 13 Minutes 7,000
Dukuh Atas ASEAN 10 Minutes 7,000
Dukuh Atas Senayan 8 Minutes 5,000
Dukuh Atas Istora 6 Minutes 4,000
Dukuh Atas Bend. Hilir 4 Minutes 3,000
Dukuh Atas Setiabudi 2 Minutes 3,000
Dukuh Atas Bundaran HI 3 Minutes 3,000
Bundaran HI Lebak Bulus 29 Minutes 14,000
Bundaran HI Fatmawati 27 Minutes 13,000
Bundaran HI Cipete 24 Minutes 11,000
Bundaran HI Haji Nawi 21 Minutes 10,000
Bundaran HI Blok A 18 Minutes 9,000
Bundaran HI Blok M 16 Minutes 8,000
Bundaran HI ASEAN 13 Minutes 7,000
Bundaran HI Senayan 11 Minutes 6,000
Bundaran HI Istora 9 Minutes 5,000
Bundaran HI Bend. Hilir 7 Minutes 4,000
Bundaran HI Setiabudi 5 Minutes 4,000
Bundaran HI Dukuh Atas 3 Minutes 3,000

MRT Jakarta

500m of Service Area - Walk Within 10 Minutes

Integration

Cafe

Restaurant

Hotel

Mall

Explore MRT

LRT Jakarta

500m of Service Area - Walk Within 10 Minutes

Integration

Cafe

Restaurant

Hotel

Mall

Explore LRT

Contact

Address

Department of Geodetic Engineering
Faculty of Engineering, Universitas Gadjah Mada
Jl. Grafika No.2 Bulaksumur, Yogyakarta, 55281

Email

alunsagaraputra@gmail.com
alun.sagara.putra@mail.ugm.ac.id

Phone

Please ask me through email